Cosgrove Construction Case Study
Location: Regent Street, Plymouth
Small development consisting of demolition of existing garage and construction of two dwellings to be completed in June 08 for sale.
This series of photos shows the progress through the contract up until the current point. Please check this space regularly to see the project progress.
Case Study Stage 1
Case Study Stage 2
Case Study Stage 3
Case Study Stage 4
Case Study Stage 5
Case Study Stage 6
Case Study Stage 7
Case Study Stage 8
Case Study Stage 9
Case Study Stage 10
Case Study Stage 11
Case Study Stage 12
Case Study Stage 13
Case Study Stage 14
Case Study Stage 15
Case Study Stage 14
Case Study Stage 15
Case Study Stage 15
Case Study Stage 15
Case Study Stage 15
Case Study Stage 15
Case Study Stage 15
Case Study Stage 15
Case Study Stage 16
Case Study Stage 17
Case Study Stage 18
Case Study Stage 19
Case Study Stage 20
Case Study Stage 21
Case Study Stage 22
Case Study Stage 23
Use the arrows on the pictures to navigate left and right through the gallery.
Title: Concrete roof repairing with GRP waterproof membrane in Torpoint
Job Description: Instructed by Veoila Water to repair leaking concrete roof on Chappledown Pumping Station, Torpoint. Works included removal of current damaged paving slabs, laying of concrete levelling screed, covering of the concrete screed with a Fibreglass (GRP) membrane, for waterproofing qualities. Then finished with epoxy grouted paving slabs to take foot traffic.
Case Study Stage 1
Case Study Stage 2
Case Study Stage 3
Case Study Stage 4
Case Study Stage 5
Case Study Stage 6
Title: Subsidence work in Taunton
Description: Instructed by client to correct bulging front wall to property as it had become a dangerous structure. Work included strengthening floor joists, supporting floors and roof to allow removal and reconstruction of front wall, with insulating block, re-rendered to a fine finish in coloured mortar. All works were carried out in conjunction with Taunton Building Control and structural engineers, Pick Everard.
Case Study Stage 1
Case Study Stage 2
Case Study Stage 3
Case Study Stage 4
Case Study Stage 5
Case Study Stage 6
Case Study Stage 7
Case Study Stage 8
Case Study Stage 9
Case Study Stage 10
Case Study Stage 11
Case Study Stage 12
Case Study Stage 13
Case Study Stage 14
Case Study Stage 15
Case Study Stage 16
Case Study Stage 17
Case Study Stage 18
Case Study Stage 19
Title: Demolish and rebuild retaining wall in Saltash, Cornwall.
Job description: Demolish a retaining wall on a public path that had become dangerous and rebuild in face block work. Work included excavation with small machinery, holding back the ground behind using timber framework, concreting a new footing and rebuilding the wall.
Case Study Stage 1
Case Study Stage 2
Case Study Stage 3
Case Study Stage 4
Case Study Stage 5
Case Study Stage 6
Use the arrows on the pictures to navigate left and right through the gallery.